407
·
Item
·
1965
Parte de Photographic Print Collection
- 00407.jpg
- Halenbeck Hall, completed in 1965, replaced Eastman Hall as St. Cloud State s home for physical education and athletics. The building was named for donor Philip Halenbeck. An addition was completed in 1980.
- Dimensions: 12.1 x 17.7 cm
- Physical Format: Black-and-white photograph
- Local Identifier: Photographic Print Collection. Photographic Prints. Buildings and Spaces. Specific Campus Buildings and Spaces. Halenbeck Hall. Exterior